
All artwork and images copyright Acolyte Industries Inc.
Use or reprinting prohibited unless explicitly approved by Acolyte Industries.
INSTALL B -- STEPS 5-8
5
7
6
8
Apply the zip tie pads (C) directly over the
double-sided tape (B) on your mounting
surface, approximately every 12 inches.
Screw the zip tie pad (C) into place with a
size 8 counter sunk at head screw.
Size 8
Drill a pilot hole through the center of each
zip tie pad (C) into the mounting surface
where they are positioned.
Slide zip ties (D) through the openings
in each of the zip tie pads (C) but do not
connect the ends of the zip ties.
PAGE 7
Comentarios a estos manuales