Acolyte RibbonLyte in Screwed-In Channel Manual de usuario Pagina 3

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 6
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 2
All artwork and images copyright Acolyte Industries Inc.
Use or reprinting prohibited unless explicitly approved by Acolyte Industries.
INSTALLATION -- STEPS 1-4
1
3
2
4
Mark points every 1 meter (3.28’) along
the intended path of channel. If channel is
shorter than 1 meter, 2 screws will
be used.
Screw in the screws (A) into the pilot hole.
Drill a pilot hole for the screws along each
mark.
PAGE 2
(D)
(A)
Clean the mountain surface free of dust
and debris using a wet cloth. For metal
mounting surfaces use rubbing alcohol (D)
to wipe clean.
(A)
(A)
(A)
(B)
Vista de pagina 2
1 2 3 4 5 6

Comentarios a estos manuales

Sin comentarios